
Madison Partners Sanctuary
Project Statistics:Project Type: Historic Duration: 0 days Budget: $348,595 Project TeamArchitect: DTW Architecture General: C.T. Wilson Construction Co. Description:C.T Wilson worked with the developer to transform a turn of the century church building into a unique office space. The existing sloped pine sanctuary floor was leveled and refinished and significant structural repairs were made to the building. All of the wood trim on the original bell tower was replaced with site built trim to match the existing profiles and a new slate roof was installed. The new plumbing, HVAC and Electrical systems were designed to be hidden and not conflict with the historic wood ceilings, plaster walls and stained glass windows. |